Story: Injection Of A Valve Bonnet

Valve

Tragic Valve Bonnet Incident

Safety is our first priority at Innovator, and we have a story to share involving a valve bonnet that helps to explain why.

On the 19th of November 2013, 3pm, a steam explosion occurred at the Antwerp Refinery, Belgium.  The accident involved the boiler feed water system (operating pressure 70 bar (1015 psi), operating temperature 280 °C (536°F)) of unit 72 (continuous catalytic reforming, CCR).
Two contractors were re-injecting sealant on a leak box on the bonnet‐to‐body flange of a 16 inch motorized valve, when suddenly the studs of the flange failed.  The valve bonnet was launched into the process area, and landed at a 25 m distance.” ¹  Both technicians lost their lives.

We all know that there are risks when injecting at high pressures and temperatures. And we also know that the equipment being injected is leaking for various reasons. Because of this, we like to ask questions.

Was the flange tightened in a controlled manner?  Was the flange alignment within tolerance?  Were the correct fasteners used?  Was the correct gasket installed? Has the flange previously been injected? So on and so forth.

 

At Innovator, the safety of our people is of paramount importance.

As a result, we have developed a proactive approach when dealing with bonnets or blind flange leaks.  The table below is taken from Innovator’s “Leak Repair Field Report” which is filled out by the Lead Technician performing leak repair at client sites.  This report is filled out on every leak repair job.

 

Story: Injection Of A Valve Bonnet 1

Before injecting any bonnet or blind flange, we ask our clients to inspect the studs to ensure the integrity is intact.  If this can’t be done, or if the studs fail inspection, we provide our clients with two options: (1) Remove and replace each stud one at a time, using load rated c‐clamps, (2) Take measurements to design and manufacture a strongback to be installed on the valve prior to injecting.

By taking these proactive safety measures, we feel that we are providing the best solution for the wellbeing of our employees completing these repairs, as well as the employees and equipment on our client’s site.  This is why at Innovator we consider ourselves “Your Partner In Building A Leak Free Workplace.”


¹ Source – TOTAL Refining and Chemicals – HSE Alert 2013-35

Share

A Leaking Flange that Innovator Could Fix with our Leak Repair Pay Once Promise

The Pay Once Promise

Innovator offers the Pay Once Promise for leak repairs, guaranteeing that if the repair fails, they will fix it again for free, prioritizing long-term partnership over revenue.

Read More »

Message Us

Meet with Us