Define the job before selecting the wrap.
Gather the asset and defect information, describe the operating duty and intended repair period, and organize the engineering, installation and handover questions in one five-page planning guide.
Use the guide to identify missing information and assign an owner before the repair is specified. It is a planning aid, not a repair design or work procedure.