A certificate becomes useful when it can be connected to the equipment being considered for the job.

Safety Tools Allmet currently publishes DNV certificate 25 ATEX 78565X, Issue 1, dated May 4, 2026. It describes a defined modular grinding system with a schedule and specific conditions. A general product name or a photograph does not identify the complete proposed configuration.

Start the discussion with a short equipment record: the air-tool model, working-head identifier, material to be worked and the current document edition. Put photographs of the actual equipment beside those identifiers.

Build an equipment record

Equipment record for the configuration discussion
RecordEnter for the proposed jobQuestion to resolve
Air tool and working headModel identifiers and photographs of the actual equipmentDoes the equipment description match the current documentation?
Document editionCertificate and instruction identifiers, issue and dateWhich stated conditions and instructions belong with this configuration?
Work scopeWorkpiece, material, access and required surfaceWhat does the responsible technical team need to confirm?

Keep the questions with the job

Then record three open questions: Does the equipment description match? Which stated conditions apply? Which instructions belong with that configuration?

Keep those questions with the work scope, including access and the surface required for the next operation. This gives the responsible technical team a specific record to review instead of a generic claim that a tool is certified.

This is an editorial introduction to documentation review. It does not approve equipment, authorize work or replace current manufacturer instructions and site requirements.

Based on manufacturer documentation reviewed October 26, 2026. Technical conditions require review for the proposed configuration.

Read the head-selection guide to connect this equipment record with the workpiece, access and required result.

Make an Inquiry

Meet with Us